![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() |
![]() |
Case Study - Leeds Creation (Coliseum Building)
Client: Leeds Creation (Coliseum Building)
Contractor: Builtec Developments Limited
Project Outline: To supply acoustic doors and security doors for the upgrade of this music venue.
Products Supplied: SoundShield™, SecureShield™
Builtec Developments Ltd were established in 1972 as an inventive and practical building and interior contractor. In the last 35 years, Builtec have gone from strength to strength and now offer a comprehensive solution for interior contracts throughout the UK, including pubs, hotels, restaurants, offices, health centres and music venues. The Leeds Creation project was Builtecs’ first experience of working with AccentHansen, however they were so impressed with their service that since then they have worked with them on a number of subsequent occasions.
The Leeds Creation project involved an upgrade to what used to be called the Coliseum Building. Opened in 1885 by Prince Albert, the Coliseum Building has played host to a royalty of international music ever since and is currently a 3,000 capacity venue with eating, drinking and dancing under one roof. Part of this project involved the manufacture and installation of twelve acoustic doors and security doors in order to upgrade the building to the required level and for this, Builtec chose AccentHansen.
Great Service
The Future
|
|
||||
| updatable websites by 123Live | © HansenGroup 2001-2010 | Terms and Conditions | Privacy | Conditions of Sale | Site Map | Steel Doors | Glass Doors | Fire Doors | Acoustic Doors | Security Doors | Cleanroom Doors | Multi-Purpose Doors | Glazed Doors | |
|||||